The Warrington Wolves Rugby Club wanted to build a new stand on filled ground that needed piling. The stand was heavy with significant tension and shear loads, which required a big pile. However, the access was very restricted with a multitude of services in the ground, which made it impossible to use a large rig. Also, the positions of many services were unknown such that every pile position needed to be hand dug first. We found that it was impossible to place the piles where the structural engineer designed them. We placed them where we could and added extra piles as necessary to take out the eccentric loadings and designed pile caps to suit.